Cabling & Connections
Scenario:
start conditions:
- UPS OFF
- Mains automatic fuse OFF
- mains power connected to displays (Singage screens)
- Mains automatic fuse ON
- Check power of displays (Singage screens)
- power up UPS
- check if network equipment has started
- check power supplies (+24V) adjust voltage level if needed
- check voltage and polarity on the power connectors at the camera side.
- connect power to the camera
- connect network cable to camera.
- connect pc to the camera network plug in the patch panel.
.... gaan we zo alle stappen oplijsten?? dat gaat een lange lijst worden met verschillende items voor bvb cameras, displays, pinpads, rack etc ....