HomePower-Up & ConfigurationAcceptance InstallationPower-Up & Configuration Acceptance InstallationCabling & ConnectionsRackI/O Module ConfigurationIO connectionsNetwork AccessPCNetwork Switch MACH-102RED 25UPS Operations & Display PanelLED IndicatorsControl ButtonsMenu StructureKeypadCamera's SurvisionDisplays ConnectingConfiguringAcceptance InstallationAll cables and connections will be visually checked and cameras and dislays must be disconnected.